“JOB SHOP SCHEDULING WITH NON-BOTTLENECK MACHINES CONSIDERING THE MAINTENANCE ASPECTS” (2023) Journal of Research Administration, 5(2), pp. 7555–7570. Available at: https://journlra.org/index.php/jra/article/view/881 (Accessed: 22 December 2024).