“JOB SHOP SCHEDULING WITH NON-BOTTLENECK MACHINES CONSIDERING THE MAINTENANCE ASPECTS” (2023)
Journal of Research Administration
, 5(2), pp. 7555–7570. Available at:
https://journlra.org/index.php/jra/article/view/881
(Accessed: 8 April 2025).